Frequently stopping and starting the line to remove degraded material, and repair the die, results in wasted time and money. Furthermore, degradation of PVC releases corrosive and poisonous gases which can damage the equipment and be hazardous to the health of the employees in the plant.
With the help of simulation, we were able to find the root cause of the problem and determine the optimized geometry in less than 2 hours. The solution ultimately saved the customer many thousands of dollars every year.